RobotStudio event

PickMaster5 project modification via backup file (and restore)

Options
Hi,

I wonder if it's possible to modify PM5 project via backup:
1) Get a current backup from the controller
2) Retrieve PM5 project from the backup
3) Modify PM5 project in PickMaster program
4) Replace the PM5 project in the backup
5) Restore backup in the controller

The reason I'm asking is that I am trying to save travel time to customer. If the customer can give the latest backup so I can modify it at the office and they restore the backup that already has the modified PM5 project, that would be brilliant!

Thanks for all the answers.
Tagged: