VSTA macro very slow
Klaus
✭✭
in RobotStudio
I have made a vsta macro that do this.
Read one line
Slpit line into 3 koordinates
create a target
loop until EOF
The files is about 400-500 lines.
It makes 3 targets per minute so it takes 3 hours per text file and i have 10 files to import. See logfile. I wont upload the code but can send it in private massege.
Is there way to increse the speed.
Best Regards
Klaus Soenderhegn
www.cadalysator.dk
Klaus Soenderhegn
www.cadalysator.dk
0
Comments
-
Sorry forgot to tell that the lines is read from a txt file
Best Regards
Klaus Soenderhegn
www.cadalysator.dk0 -
-
Hi Klaus,
Please send the VSTA code and a description of the problem (as above) to your local ABB representative that manages your RobotStudio support. He can bypass it to our technical support team if needed.
Going through the regular support channel will ensure correct treatment of your problem.
Kind regards,
Henrik Berlin
ABB0
Categories
- All Categories
- 5.5K RobotStudio
- 396 UpFeed
- 18 Tutorials
- 13 RobotApps
- 297 PowerPacs
- 405 RobotStudio S4
- 1.8K Developer Tools
- 249 ScreenMaker
- 2.7K Robot Controller
- 310 IRC5
- 59 OmniCore
- 7 RCS (Realistic Controller Simulation)
- 786 RAPID Programming
- AppStudio
- 3 RobotStudio AR Viewer
- 18 Wizard Easy Programming
- 105 Collaborative Robots
- 5 Job listings