RobotStudio event

feature request, sync all though not in use

I find it troublesome that changes made to a wobjdata ( +others) are not beeing synced with the rapid code in the VC if RS does not see them beeing used. Perhaps there might be some code not seen by RS that needs the changes - like in my case.

Presently sync. is just as bad as the first Nokia sync tools - "oh you haven't used this contact in 2 months, i silently ignore it and save 0.01 ms of sync time, great"

Btw, what is the rationale of the two sync icons - should they not be swapped. It feels like the text is ok, but the flow of sync is of the opposite direction of the arrows.

Regards

Comments

  • You men the arrows icons ?
    Regards
    Knud Erik Lindberg
    Jorgensen Engineering
  • In 5.13 that will be coming in April, you will be able to sync also wobjs and tooldatas currently not used in an instruction.
    Henrik Berlin
    ABB