second reference
Diede
✭
in RobotStudio
< ="-" ="text/; =utf-8">< name="ProgId" ="Word.">< name="Generator" ="Microsoft Word 12">< name="Originator" ="Microsoft Word 12">
Hy,
How do you
attach targets to a second reference.
When you move the second reference the targets move along with it.
grts
0
Comments
-
If I understand you correctly, you want to use the same target (robtarget) with two differents workobjects? This must be defined in RAPID and then synced to the Station.The targets will be moved with their parent workobject. (When you have two instances of the same robtarget data, then you will see two frames in the graphical view).Henrik Berlin
ABB0
Categories
- All Categories
- 5.7K RobotStudio
- 401 UpFeed
- 21 Tutorials
- 16 RobotApps
- 306 PowerPacs
- 407 RobotStudio S4
- 1.8K Developer Tools
- 251 ScreenMaker
- 2.9K Robot Controller
- 366 IRC5
- 90 OmniCore
- 8 RCS (Realistic Controller Simulation)
- 857 RAPID Programming
- 43 AppStudio
- 4 RobotStudio AR Viewer
- 19 Wizard Easy Programming
- 111 Collaborative Robots
- 5 Job listings