second reference
                
                    Diede                
                
                     ✭                
            
                        
                
                                    
                                  in RobotStudio             
            
                    < ="-" ="text/; =utf-8">< name="ProgId" ="Word.">< name="Generator" ="Microsoft Word 12">< name="Originator" ="Microsoft Word 12">
                
                Hy,
How do you
attach targets to a second  reference. 
When you move the second reference the targets move along with it. 
grts
0  
            Comments
- 
            If I understand you correctly, you want to use the same target (robtarget) with two differents workobjects? This must be defined in RAPID and then synced to the Station.The targets will be moved with their parent workobject. (When you have two instances of the same robtarget data, then you will see two frames in the graphical view).Henrik Berlin
ABB0 
Categories
- All Categories
 - 5.6K RobotStudio
 - 401 UpFeed
 - 21 Tutorials
 - 15 RobotApps
 - 306 PowerPacs
 - 407 RobotStudio S4
 - 1.8K Developer Tools
 - 250 ScreenMaker
 - 2.9K Robot Controller
 - 363 IRC5
 - 81 OmniCore
 - 8 RCS (Realistic Controller Simulation)
 - 853 RAPID Programming
 - 31 AppStudio
 - 4 RobotStudio AR Viewer
 - 19 Wizard Easy Programming
 - 110 Collaborative Robots
 - 5 Job listings