Forum Migration Notice
We're transitioning to a more modern community platform by the end of this year. Learn about the upcoming changes and what to expect.
How to get update of Project Loaded in RS
Lin
✭
Hi Guys,
I think my previous post is not understandable by you.
My add-in is running when I open robot studio with one station [station 1] running.
My add-in has the knowledge about the current station [station 1] in RS.
If I close the [station 1] and open other station [station 2] , My add-in should have the knowledge about [station 2].
How can I achieve this using station close and station open events happening in RS?
Thank you.
Lin2012-10-29 05:39:42
Lingaa
0
Comments
-
Please find the solution given by John in the below Linkhttp://forums.robotstudio.com/forum_posts.asp?TID=7259Thanks John. It is working fine for my application.
Lin2012-11-08 05:37:09Lingaa0
Categories
- All Categories
- 5.6K RobotStudio
- 401 UpFeed
- 21 Tutorials
- 15 RobotApps
- 306 PowerPacs
- 407 RobotStudio S4
- 1.8K Developer Tools
- 250 ScreenMaker
- 2.9K Robot Controller
- 365 IRC5
- 84 OmniCore
- 8 RCS (Realistic Controller Simulation)
- 854 RAPID Programming
- 37 AppStudio
- 4 RobotStudio AR Viewer
- 19 Wizard Easy Programming
- 110 Collaborative Robots
- 5 Job listings