RobotStudio event

Better way to get different revisions of a program synced across virtual and actual controller?

Right now I'm just using the "save and load program" functionality to get things across, but it really is a big hassle if done multiple times in a row.

A good UX designer would have included a single button to update either controller with the latest version of the program from the other one. 

What is the "create relation" thing (when you rightclick on a controller ) supposed to do?

Comments

  • A Relation is meant for exactly that, transferring RAPID (and other files) between a VC and RC in both directions.
    Individual declarations or files can be excluded and you can compare the source and target to see what will be changed.

    Do try it out!
    Johannes Weiman
    Software Engineer
    RobotStudio Team, ABB Robotics